Information:
The Logix 3200 positioner is used for crude oil production on the Dai Hung platform.
Condition:
The positioner was not functioning.
MOG’s Solutions:
-
Before offshore deployment: Initially identified possible failure in the main board or UI card.
-
Pre-ordered both the main board and UI card.
-
On-site: Removed and replaced the main board for testing – the positioner still did not operate.
-
Removed and replaced the UI card – the positioner resumed normal operation.
-
Valve function test: PASS.